HOME | DD

Published: 2023-11-27 15:48:05 +0000 UTC; Views: 1468; Favourites: 19; Downloads: 1
Redirect to original
Description
Remember this guy, Well I've gave him a small update. I've add Wheels flange that most Thomas and friends Sprite are getting, Add him in his Ironwork days as well give him a different crew.Here little work in progress timeline:
1848 - Built By Ruthford Ironworks
1915 - Ironworks goes under and Robby is sold to London, Brighton and South Coast Railway to work as station pilot in Brighton.
1918 - reassign to Castlebay to run the branch line, Meet Stefan.
1922 - An extension is built to Riverwood, Robby become it main engine and meet the new Express Engine name Dean.
1939 - A Coal mine is open not far from Castlebay and is run by an engine name Annie, This mine supplies the line and towns.
1948 - British railway is Formed, the Former line become the new Castlebay mainline while the extension became the new branch line.
1950 - Robby is reassign to the Riverwood line, Sarah arrive to help out and become the line third engine.