HOME | DD

Published: 2010-09-23 23:28:11 +0000 UTC; Views: 224; Favourites: 1; Downloads: 2
Redirect to original
Description
The best part about having a 7th hour with a cool A/V teacher? Access to computers with all my programs on it!I was able to work on some textures during lunch. This is what I have atm.
I sealed the incline's side with a new texture and layer so it is no longer "see through"
When I've added the other part (half) of the 2nd floor, I'll post another screenshot.