HOME | DD

Horizon-robotics β€” [CLASSIFIED] Event 390A4JA - Cmd_rvd Test site [πŸ€–]

Published: 2023-11-29 02:03:55 +0000 UTC; Views: 4920; Favourites: 53; Downloads: 25
Redirect to original
Description

10082034 08:00:27: Initiation of the test with the "HFC" prototype mk2a. #5541a2s , actually robotized, first grade tier (red),Β  has recieved a order to enter into the booth. She responds and position into it.

10082034 08:01:04: Activation of the transformation process. Procedures for replacement and updatingΒ  #5541a2s 's hardware starts.

10082034Β 08:02:04: Initial integration of the new hardware with the robotized element observed. Continuous monitoring of vital signs initiated to ensure stability during the process.

10082034 08:02:26: The transformation process progresses successfully, reaching 40% integration of the new hardware. Functioning parameters are within expectations.

10082034 08:02:57: Integration level reaches 70%. No signs of instability in vital signs, maintaining within acceptable limits.

10082034 08:04:03: Completion of the transformation process. 100% integration of the new hardware achieved. Resonance with environmental commands observed.

10082034 08:04:10: Process closure. System stabilization and completion of hardware replacement. #5541a2s now is second grade tier (silver).

Effectiveness Rates:

  • Integration of New Hardware: 100%
  • Stability of Vital Signs During the Process: 99.9%
  • Deployment viability: Pass
  • Booth integrity: Pass
  • Mobile cpu integrity: Pass


The R&D team delivery good results into her tests. The director board approves and start to replicate the mobile booths and start to seek places to install.


Related content
Comments: 1

bluessaurus [2023-11-30 02:38:52 +0000 UTC]

πŸ‘: 1 ⏩: 0