Totes-Mcgoats — Bridge Technical Drawing
Published: 2018-02-05 10:38:14 +0000 UTC; Views: 272; Favourites: 8; Downloads: 1 Redirect to originalDescription
A project for an engineering class. Our group named it "50 Shades of Tape", because the model build was all held together with a ton of tape. We then tested how much force it could withstand.
Related content