HOME | DD

BigRZA — notifyOSD conky by-nc

Published: 2011-04-28 19:14:03 +0000 UTC; Views: 134155; Favourites: 178; Downloads: 48487
Redirect to original
Description The conky setup i used here [link]

The files are hidden!

.conky (folder)
.conkyrc

dont forget to backup your .conkyrc before extracting it to your home folder

Notify osd for covergloobus [link]
Related content
Comments: 76

hyper2 [2011-05-01 07:16:33 +0000 UTC]

Feautured Apple-Art
[link]

👍: 0 ⏩: 1

BigRZA In reply to hyper2 [2011-05-01 07:26:33 +0000 UTC]

Thank you Nice site btw added to rrs

👍: 0 ⏩: 0

Rasa13 [2011-04-29 01:37:15 +0000 UTC]

Very nice!
well done! <3

👍: 0 ⏩: 1

BigRZA In reply to Rasa13 [2011-05-01 07:26:52 +0000 UTC]

Thanks rasa

👍: 0 ⏩: 1

Rasa13 In reply to BigRZA [2011-05-03 07:43:38 +0000 UTC]

youre welcome bro.
Im having trouble getting my temps to show...
what should i do?! lol *hides face*

its a beauty though mate, got it running in 11.04 now.

👍: 0 ⏩: 1

BigRZA In reply to Rasa13 [2011-05-04 14:55:16 +0000 UTC]

Do you have lm-sensors installed?

👍: 0 ⏩: 1

Rasa13 In reply to BigRZA [2011-05-04 16:07:10 +0000 UTC]

yes man, I do.

👍: 0 ⏩: 1

BigRZA In reply to Rasa13 [2011-05-04 16:52:55 +0000 UTC]

Mmmh. do you get something when you type sensors in the terminal ?

👍: 0 ⏩: 1

Rasa13 In reply to BigRZA [2011-05-04 17:17:14 +0000 UTC]

hi bro,
I sure do..
it is.. ( i tried to shorten it- temp 12-16 said N/A so i omitted them)

[-natty-ThinkPad:~$ sensors
acpitz-virtual-0
Adapter: Virtual device
temp1: +64.0°C (crit = +127.0°C)
temp2: +66.0°C (crit = +99.0°C)

thinkpad-isa-0000
Adapter: ISA adapter
fan1: 2813 RPM
temp1: +64.0°C temp2: +34.0°C temp3: +43.0°C temp4: N/A temp5: +50.0°C temp6: N/A temp7: +30.0°C temp8: N/A temp9: +37.0°C temp10: +33.0°C temp11: +53.0°C ]

Thank you, I appreciate. <3

👍: 0 ⏩: 2

Aerum In reply to Rasa13 [2011-05-13 02:29:45 +0000 UTC]

My temp didn't work too, but after a bit of search I changed this code:

Temperatur: ${color1}${font Ubuntu:style=Bold:size=9}${color1}${execi 30 sensors | grep 'Core0' | cut -c15-16}°C${color}${font}

To this:

Temperatur: ${color1}${font Ubuntu:style=Bold:size=9}${color1}${execi 8 sensors | grep -A 1 'Core 0' | cut -c13-16 | sed '/^$/d'} °C${color}${font}

You'll need to change "Core 0" by "temp1" and "temp2".

👍: 0 ⏩: 2

Bobbel77 In reply to Aerum [2011-05-13 10:16:48 +0000 UTC]

Thanks for this post. It works for me to.

👍: 0 ⏩: 0

Rasa13 In reply to Aerum [2011-05-13 03:19:17 +0000 UTC]

Oh Thanks Aerum! I will try it out and let you know!

👍: 0 ⏩: 0

BigRZA In reply to Rasa13 [2011-05-04 18:30:35 +0000 UTC]

sensors seems to work. What does conky say when you run it in terminal ?

👍: 0 ⏩: 2

0ziris In reply to BigRZA [2011-05-12 22:23:15 +0000 UTC]

You have to fix .conkyrc. I had to change from grep 'Core0' to grep 'Core 0'. So you should change grep string to appropriate value, it seems yours is grep 'temp1' (if that's temperature for core 0).

👍: 0 ⏩: 0

Rasa13 In reply to BigRZA [2011-05-04 21:24:48 +0000 UTC]

yeah sensors work fine in my AWN.
conky says..
@ahmose-natty-ThinkPad:~$ conky
Conky: desktop window (10000c6) is subwindow of root window (ac)
Conky: window type - override
Conky: drawing to created window (0x4000001)
Conky: drawing to double buffer

lol

👍: 0 ⏩: 1

BigRZA In reply to Rasa13 [2011-05-05 15:17:33 +0000 UTC]

Than my friend, I have no clue XD

👍: 0 ⏩: 1

Rasa13 In reply to BigRZA [2011-05-05 19:23:30 +0000 UTC]

haha!~ No worries my friend!
Thanks for the great stuff. <3

👍: 0 ⏩: 0

Ubuntico [2011-04-29 00:27:57 +0000 UTC]

Nice setup but, where is the conkybg.lua file called in the .conkyrc file?

👍: 0 ⏩: 1

BigRZA In reply to Ubuntico [2011-05-01 07:28:06 +0000 UTC]

Thats from an older script but its commented out in this one so you dont need it

👍: 0 ⏩: 1

Ubuntico In reply to BigRZA [2011-05-01 15:17:06 +0000 UTC]

Ok thanks

👍: 0 ⏩: 0

Synaide In reply to ??? [2011-04-28 19:26:52 +0000 UTC]

Awesome..........Love this..........

Can u port it to rainmeter............?

👍: 0 ⏩: 1

BigRZA In reply to Synaide [2011-05-01 07:29:26 +0000 UTC]

Sorry dont know rainmeter but if you know someone who can do he/she can do it

👍: 0 ⏩: 1

Synaide In reply to BigRZA [2011-05-01 13:14:01 +0000 UTC]

ok dude... still love this.

👍: 0 ⏩: 0

kingsidorak In reply to ??? [2011-04-28 19:21:43 +0000 UTC]

this is almost better than Coretemp, but Coretemp has overheat protection

👍: 0 ⏩: 1

BigRZA In reply to kingsidorak [2011-05-01 07:30:15 +0000 UTC]

Thank you and yes this is only a monitor

👍: 0 ⏩: 0