HOME | DD

Published: 2009-08-12 02:27:25 +0000 UTC; Views: 2348; Favourites: 16; Downloads: 0
Redirect to original
Description
Added some more detail to the corridor, including some electrical conduits in the ceiling. Almost done with the detail work, next comes the right side of the ceiling with some boxes and then the door - gotta make it beefy and spacey lookingRelated content
Comments: 4
Chromattix [2009-08-12 05:08:46 +0000 UTC]
Wow, it's looking really good! I never would have thought of adding all those bars on the walls, but that suggests that there's a lot of stuff being stored and makes it cooler...but I wonder what's in those vaults
👍: 0 ⏩: 1
2753Productions In reply to Chromattix [2009-08-13 01:28:18 +0000 UTC]
LOL thanks Matt Those are maintenance and storage lockers
[link]
👍: 0 ⏩: 0