HOME | DD

Published: 2012-08-09 06:27:19 +0000 UTC; Views: 2847; Favourites: 24; Downloads: 15
Redirect to original
Description
This thing...... Okay, no more scratch builds for me for a long time. I had a great time building it, but literally every portion and piece went through multiple prototypes and designs. I spend 3 weeks alone just designing the electronic and mechanical layouts. I probably put 80-100 hours into it, and a decent portion of that was trying out different materials and troubleshooting.Hey, here's a video of it in action:
[link]
I have more pics in a Photofucket account, and I'll clean them up and put em on DA here when I get a chance. I have to go out to Indianapolis this weekend for DCI so I won't be able to mess with anything until after that.
[link]
Related content
Comments: 8
Hypercats In reply to Sch1itzie [2012-08-13 15:47:15 +0000 UTC]
Yep! He has it now and then it's coming back to me for some touch up work.
👍: 0 ⏩: 0
KingMakerCustoms [2012-08-09 15:27:59 +0000 UTC]
Incredible! Watched the video, doubly impressed there. Removable stock behind the battery cover was a great touch, gives it a very unique shape.
👍: 0 ⏩: 1
Hypercats In reply to KingMakerCustoms [2012-08-13 02:49:23 +0000 UTC]
Thanks! I just followed the concept art, the commissioner said "build us this" and I had to make it happen. The stock needed to be removable because I needed a place to put the 8 AA batteries. :/
👍: 0 ⏩: 0
Hypercats In reply to faustus70 [2012-08-13 02:49:58 +0000 UTC]
Thanks! I have to go back to making more pulse rifle stampedes now, so no more custom work from me for a while.
👍: 0 ⏩: 0
Uratz-Studios [2012-08-09 09:22:33 +0000 UTC]
I agree man. These types of build friggin take the life outta ya. Great work though
👍: 0 ⏩: 1
Hypercats In reply to Uratz-Studios [2012-08-13 02:50:31 +0000 UTC]
Thanks! It was over 100+ hours after I factor in all the R&D time and multiple parts prototypes.
👍: 0 ⏩: 0